Evidence package
Collected artifacts, source hashes and a manifest, with package signatures available for independent verification.
From evidence to confidence.
Connect control requirements to source evidence and a technical record an assessor can inspect.
Evidence operations
An assessment needs more than a folder of documents. Control Frame keeps the method, source, collection history and review standing with the evidence. Engineers can prepare material in the same record that control owners and assessors use to examine its relevance and accept it for the assessment.
Source and method
Framework versions and source-native requirements provide the assessment's reference point. Scoped procedures and accepted sources connect the control being reviewed to the material that can support it.
Interactive example
Change the source record, assessment period and review standing to see what belongs in the assessor's package.
Example assessment · quarterly access review
The reviewer needs a traceable version of the access-review record.
The example scope is the application access review for Q2.
A source artifact and an acceptance decision are separate evidence.
Authored examples for exploring the workflow. Your choices update only this demonstration.
2 of 3 example checks met. Follow the evidence questions before carrying the example forward.
Source artifactMet
Access-review export v3 carries its source identifier, retained hash and collection history.Assessment relevanceMet
The export covers the declared application and Q2 evidence period.Control-owner reviewReview
The control owner's acceptance and relevance rationale are still an open request.Request a named control-owner decision with its relevance rationale.
Illustrative review record · human decisions and subsequent actions keep their own standing.
The product
Control Frame organizes compliance around the evidence behind a control. Source lineage, signed manifests, requirement mapping and live control tests give reviewers a clear path from a stated requirement to the technical work that supports it.
Inside Control Frame
Give compliance teams, engineers and assessors a shared technical record. Each requirement can be examined alongside the source artifact, collection history, relevant test and review decision that support it.
Agree the applicable framework, systems, evidence period and responsible owners. Establish what the review needs before collecting material.
Bring policies, system records and collected artifacts into the evidence workspace. Preserve source, version, period and ownership so reviewers can judge relevance.
Hash the artifacts and assemble a manifest. Package signing and verification make the retained evidence inspectable for changes after collection.
Connect evidence to control requirements and proposed cross-framework mappings. Keep live test results and missing evidence beside the requirement being reviewed.
Named reviewers accept evidence and retain the reason for their decision. Assessor workspaces present the technical record with its provenance and outstanding requests.
Collected artifacts, source hashes and a manifest, with package signatures available for independent verification.
Requirements, proposed mappings, test results and evidence gaps, with a separate review decision for each applicable control.
Evidence, custody details, requests and named decisions organized around the assessment being performed.
Control Frame prepares and preserves the assessment record. Independent assessors retain responsibility for their opinions and certification decisions.
In practice · illustrative scenario
An assurance team needs to review an access control. The engineer supplies a policy and system records, but the reviewer must establish which versions and dates belong to the assessment.
Connect the requirement to its source version and the agreed systems and period before accepting the supplied material.
Examine artifact versions, custody history and relevant test evidence. Record a request where the supplied material leaves a question open.
Retain the named acceptance decisions and package eligible evidence with its manifest for the assessor's examination.
The illustrative output is a control record whose evidence, outstanding questions and review decisions can be followed back to their sources.
A closer look
Start with the versioned framework record and its stated product standing, then agree the applicable requirements and assessment period. Coverage is established for that scope rather than inferred from the size of the framework directory.
Through document intake and the collection paths configured for the project. Connector and private-runner access, accepted sources and review requirements are agreed for the environment so each artifact has a defined route into custody.
The organized technical record, including applicable requirements, evidence provenance, requests and named review decisions. An eligible portable package adds its manifest and verification material. The assessor forms the independent opinion from that evidence.